SFO, Terminal 3, Boarding Area E

Project Details

Project Name
SFO, Terminal 3, Boarding Area E
Architect
Gensler
Project Types
Transportation
Shared By
August King
Project Status
Built
Size
105,800 ft²
Team
Project Manager: Gary Brandau
Principal : Chad Hamilton
Architect : Robin Chiang

Project Description

FROM AIA SAN FRANCISCO:

The design of San Francisco International Airport’s renovated Terminal 3 Boarding Area E (T3BAE) delivers a clean, modern and efficient traveler experience. The design features a range of elements that offer travelers a place where they will enjoy spending time.

Building on the success of San Francisco International Airport's Terminal 2, the team set out to transform an outdated section of Terminal 3 built in the 1970s, into a world class terminal. The existing floor plate was expanded to accommodate more gates and provide a spacious array of waiting and concessions spaces, and new perimeter glazing opened up views to the airfield. A new roof allows a sculpted ceiling plane to bring daylight deep into the space, resulting in a light and airy feeling. Now serving over 10,000 United passengers annually, T3 BAE offers travelers many choices for how they would like to enjoy their time in the airport. Passengers can view the exquisite art, change clothes in private dressing rooms, stretch out in the Yoga Room, or let their children unwind in an interactive play area.

Topography inspired both the spatial layout and the textural nature of the space. This design concept was defined as a series of visual and physical destinations – a place to orient, observe, discover and survey the landscape. Concessions dot the landscape, while uninterrupted terminal views give passengers a sense of control over their environment. With tapered edges overhanging clerestory glazing, the roof is structured with lightweight, long-span trusses concealed within a finished architectural ceiling. This approach allowed designers to remove the existing middle two rows of structural columns, creating an open and flexible plan. Increased floor-to-floor height allowed for clerestory placement and a monumentally scaled window at the end of the pier.

Upcoming Events

  • Design Smarter: Leveraging GIS, BIM, and Open Data for Better Site Selection & Collaboration

    Live Webinar

    Register for Free
  • Slate Reimagined: The Surprising Advantages of Slate Rainscreen Cladding

    Webinar

    Register Now
  • The State of Residential Design Today: Innovations and Insights from RADA-Winning Architects

    Webinar

    Register for Free
All Events