Modelon

Project Details

Project Name
Modelon
Location
320 N Main StAnn ArborMI48104
Architect
SYNECDOCHE
Project Types
Office
Project Scope
Interiors
Shared By
adammsmi
Project Status
Built
Year Completed
2020
Style
Modern
Size
3,500 ft²
Team
Principal Architect: Adam Smith

Project Description

The design of a growing tech office into a new space with the goal of layering in the brand throughout with tactical architectural elements that perform spatially while creating visual impact.

As a small space it was important to consider the program and use in ways that did not create confined areas. A series curtains in both the open space and meeting rooms enable the users to control visual connection and privacy layers while simultaneously partitioning and dampening acoustics. The curtains also enable the project to flex into several space configurations without the cost of building construction, creating an economical component to do several tasks for the space.

Workspace and meeting rooms are separated by a common area with kitchenette for casual touch down conversations, all-hands meetings, as well as lunch and coffee breaks. The flexible furniture including custom tables built by the design team support the rearrangement of the core space for various gathering types.

Each meeting room is an immersive color experience inspired by the sweedish origins of the company and their vibrant use of color as a cultural practice to brighten the long winter nights. This overapplication of color camouflages the exposed mechanicals and conduit for smoothing out of the rough edges of the existing space. Matching curtains complete the saturation when closed. The secondary brand colors are shades of grey and blue, utilized in the interior meeting rooms for a serene condition. The primary brand color of orange is used in the boardroom with windows to soften the contrast.

The brand colors repeat throughout the space in a smaller cadence of details including steel grid structures for lights, furniture, and millwork. The project utilized required components as design features as a strategic output of the low budget project. Such as in the start-up industry and venture capital, there is a desire to run lean and innovative in these stages of development and the design team replicated this strategy through the interior design. The 3,400 sq. ft. space had a final construction cost of $300,000.

Upcoming Events

  • Future Place

    Irving, TX

    Register Now
  • Archtober Festival: Shared Spaces

    New York City, NY

    Register Now
  • Snag early-bird pricing to Multifamily Executive Conference

    Newport Beach, CA

    Register Now
All Events