Carnegie Library

Project Details

Project Name
Carnegie Library
Location
801 K St NWWashingtonDC20001
Project Types
Cultural
Shared By
Jesse Floyd
Project Status
Built
Year Completed
2019
Size
63,000 ft²
Team
Partner, Director of the DC Office, Partner-in-Charge: Hany Hassan
Partner: Jill S. Cavanaugh
Principal: Jennie Gwin
Senior Associate: Bradley Cambridge
Senior Associate, Environmental Graphics: Lars Moestue
Associate: Caroline VanAcker

Project Description

A holistic transformation of a historic Washington, DC landmark offers a contemporary interpretation of the original design intent and allows the building to retain its original purpose of easing access to knowledge and information.

The Carnegie Library on Mount Vernon Square, one of the city’s most stunning buildings and expressions of civic pride, opened in 1903 as a gift from American philanthropist Andrew Carnegie. The visionary project included a complete restoration of the exterior Vermont Marble and Milford Granite facade, restoration of the historic windows, restoration of the historic light well in the central atrium, the restoration of the historic reading rooms, including ceiling, window and pilasters, and return of historic detailing, restoration of the grand staircase, and restoration of the basement Guastavino ceiling.

The preservation strategy relied on identifying hidden chases, shafts, and vertical pathways to invisibly add new building systems and lighting, carefully integrating contemporary features into the historic building fabric. BBB coordinated and documented the removal of loadbearing masonry walls and non-original floor slabs to transform the cloistered library space into an open and engaging space, welcoming visitors to experience the next century of learning. The weathered condition of the architectural details was respected and left intact, however deteriorated sculptural elements on the main façade were consolidated and minimally restored using Dutchman and mortar patching repairs where appropriate. The original wood windows were restored and retrofitted with new energy efficient glazing.

A newly imagined entry staircase on the north facade provides a welcoming portal to the convention center and Shaw District beyond. The project also included new site walkways and south plaza, making the building accessible on the south facade for the first time, new landscaping, incorporating of bioretention beds, and new facade lighting.

Upcoming Events

  • Future Place

    Irving, TX

    Register Now
  • Archtober Festival: Shared Spaces

    New York City, NY

    Register Now
  • Snag early-bird pricing to Multifamily Executive Conference

    Newport Beach, CA

    Register Now
All Events