Bronx YMCA Aquatic & Fitness Center

Project Details

Project Name
Bronx YMCA Aquatic & Fitness Center
Location
2 Castle Hill AveBronxNYUSA10473
Project Types
Project Scope
New Construction
Shared By
Donald Blair
Project Status
Built
Year Completed
2003
Style
Modern
Size
22,000 ft²

Project Description

The Bronx YMCA is on a large waterfront site with an existing gym building and an outdoor pool. The new, 2-story Aquatics and Fitness building was constructed to provide an indoor swimming pool, men’s and women’s locker rooms, administrative offices, and a fitness/aerobics area. The new facility is designed to expand horizontally, rather than vertically, as there is ample land. The core spaces of administrative offices, locker rooms, cardiovascular area, and the pool were planned such that additional multipurpose classrooms can be added to the south end. A long membership lounge, with views to the waterfront though the glassy east façade, is the main feature and also acts as a connector between the north and south ends of the building. The building is situated within the 100 year flood plain and is designed to be as high as possible in relation to the shore line to take advantage of the view and to address the flood plain situation. The lower portion of the structure is designed to be flood proof.

Upcoming Events

  • Build-to-Rent Conference

    JW Marriott Phoenix Desert Ridge

    Register Now
  • Reimagining Sense of Place: Materiality, Spatial Form, and Connections to Nature

    Webinar

    Register for Free
  • Homes that Last: How Architects Are Designing a Resilient Future

    Webinar

    Register Now
All Events