An Accessible Design Bath on a Very Short Timeline

Project Details

Project Name
An Accessible Design Bath on a Very Short Timeline
Location
1881 Nash StArlingtonVAUSA22209
Shared By
Russell Glickman
Project Status
Built
Year Completed
2015
Size
200 ft²
Team
Contractor: Russell Glickman
Designer: Keith Long
Interior Designer: Lanna Ali-Hassan
Room or Space

Project Description

This award-winning bathroom remodel/renovation was truly unique. The client has ALS, a progressive Neurodegenerative disease, and therefore needed to convert a basically brand new 18th floor condominium bathroom into an accessible bathroom. Returning from Florida to the DC area in less than a month, the modifications had to be done extremely quickly.
The client was away for the duration of construction. They came back to a completely made over bathroom and couldn’t have been more thrilled. The renovation included relocating some existing items and installing others completely new. The items that were removed from the existing bathroom included: a platform and a tub, a shower seat and a niche, a shower glass enclosure, a marble shower and bath floor and walls, a framed partition, a stone countertop, a wall-hung glass mirror, a sliding door and a toilet. The existing medicine cabinet, vanity base cabinets, and sink were relocated within the room.

Read their story here –
http://www.glickmandesignbuild.com/an-accessible-design-bath-on-a-very-short-timeline/

Upcoming Events

  • Slate Reimagined: The Surprising Advantages of Slate Rainscreen Cladding

    Webinar

    Register Now
  • The State of Residential Design Today: Innovations and Insights from RADA-Winning Architects

    Webinar

    Register for Free
  • Specifying Smarter with Copper-Clad Aluminum (CCA) Metal-Clad Cable

    Webinar

    Register for Free
All Events