2 Hangar Doors – C-17 Globemaster III

Project Details

Project Name
2 Hangar Doors – C-17 Globemaster III
Location
Pittsburgh Air ReserveTownshipPA15108
Architect
AERODOOR
Project Types
Transportation
Project Scope
New Construction
Shared By
AeroDoor
Project Status
Built
Year Completed
2020
Style
Traditional
Size
115,000 ft²
Certifications & Designations
LEED Silver
Team
Project Director: PAUL BLAKE

Project Description

Contracted to design, manufacture and install two unidirectional bottom rolling hangar doors at Pittsburgh Air Reserve for the forthcoming C-17 Globemaster III’s.

Class 1 Div 2 Explosion proof motor operators and controls.

Sensing edges, military specifications.
Linear cable system.

Design build contract for the U.S. Army Corps of Engineers.

Manufactured and installed by AeroDoor employees.

Upcoming Events

  • Slate Reimagined: The Surprising Advantages of Slate Rainscreen Cladding

    Webinar

    Register Now
  • The State of Residential Design Today: Innovations and Insights from RADA-Winning Architects

    Webinar

    Register for Free
  • Specifying Smarter with Copper-Clad Aluminum (CCA) Metal-Clad Cable

    Webinar

    Register for Free
All Events