Pier 40 2100

Project Details

Project Name
Pier 40 2100
Location
92 Hudson River GreenwayNew York (and vicinity)NY10014
Architect
DFA
Shared By
ABOVE THE FOLD
Project Status
Concept Proposal
Year Completed
2018
Size
653,400 ft²
Team
Laith Sayigh: Principal
Chai Chen: Senior Project Manager
Dongkyum DK Park: Designer

Project Description

As part of DFA’s three-part series on the future of the City of New York, the studio founded by British-born architect Laith Sayigh has re-envisioned Pier 40 as a resilient mixed-use complex of housing, recreation and commerce which maintains the existing popular soccer field.

Pier 40 is the largest pier structure on the Hudson River with a 15-acre footprint and generating approximately 30% of the Hudson River Park Trust’s annual operating budget. Despite its vital importance as a parking garage, athletic complex and offices, the Pier is deteriorating and need of critical infrastructure repairs which will cost in the hundreds of millions of dollars. A valuable and viable real estate asset, Pier 40 should be reimagined as a response to its structural and natural strengths and weaknesses. DFA’s site-specific solution introduces mixed-housing, mixed-recreation and mixed-commerce designed to flood with the rising current and 21st century reality of the over-water structure.

Innovative Structure

Following an analysis of the zoning and state of existing piles, DFA identified areas of Pier 40 that are fit for supporting clusters of program influenced by the Pier’s predominant recreational use and addressing a city-wide need for affordable housing. From this four tower typologies emerge as viable options for spreading a variety of housing density across the site. Combining the analysis with design, DFA utilized an algorithm to determine the optimal location for each tower type, determining that each tower must have at least three structurally sound connection points to support the weight/load. The Pier’s existing structure is optimized for performance as the foundation for a new community.

Environmental Responsiveness

Second to structural integrating is environmental integration. New York City’s sea level is expected to rise 11-30 inches by 2050 and between 50 to 75 inches by 2100, with the majority of current buildings not designed to accommodate such inevitable changes. DFA’s vision for Pier 40 takes a longer-term view with comprehensive design approach for the future. The undulating landscape deck around the towers is lifted to accommodate non-housing programs including retail, theater, sports complex and boathouse, which remain active until 2050. Floating landscape pods—additional space for human interaction, oyster beds and diverse plantings—will surround the Pier to absorb wave energy during major storm surges. Beyond 2050, as regular flooding begins to engulf the coastline as we know it, the landscape deck transforms into a floating island with new pathways built to connect the evolved wetland ecosystem to Manhattan. Each of the four tower typologies providing luxury, affordable and market-rate housing on the northern and southern edges of the Pier is comprehensively designed for year 2100 sea level projections. Until 2050, the towers will offer Pier-level lobbies and elevators. As the water level begins to rise and submerge the structure, the landscape deck’s integrated access points and existing elevator cores.

Resilient Housing

In total, nineteen residential towers organized into eleven clusters and offering five types of living across 450 units will provide New Yorkers with diverse housing options. Ranging in height from 96- to 455-feet, DFA utilizes six-glulam core and superstructure members to minimize their contact with the original Pier deck and elevate the units sixty inches above the predicted storm surge levels. Between the core and superstructure are radial glulam supports, CFT bracing panels and steel joining plates, with glazing enclosing the apartments ranging from studios to three bedrooms. Above the Pier-deck lobby is a 360-degree observation deck that looks onto the undulating landscape deck. After 2050, the observation deck becomes the building’s entry point via new pathways. All towers are equipped with accessible green roofs, with additional “green pockets” on various levels of the tallest tower Type A. All units offer views to the river and city.

Upcoming Events

  • Build-to-Rent Conference

    JW Marriott Phoenix Desert Ridge

    Register Now
  • Reimagining Sense of Place: Materiality, Spatial Form, and Connections to Nature

    Webinar

    Register for Free
  • Homes that Last: How Architects Are Designing a Resilient Future

    Webinar

    Register Now
All Events