Stockman Bank Missoula Downtown

Project Details

Project Name
Stockman Bank Missoula Downtown
Location
Missoula MT
Architect
Cushing Terrell
Project Types
Commercial
Shared By
CTA Cushing Terrell
Project Status
Built
Year Completed
2018
Size
67,753 ft²
Team
Architecture: Cushing Terrell

Project Description

Recently certified LEED v4 Platinum, this is the most energy-efficient building in Stockman Bank’s portfolio. In addition to featuring high-performance glass and efficient lighting, energy-efficient elevators, and solar arrays, the facility achieves nearly a 70% reduction in water consumption thanks to an innovative on-site rainwater storage system providing 100% of average annual water use for toilet and urinal flushing.

Stockman Bank opened its location in historic downtown Missoula in December 2017. The project is a 67,753 sq. ft., six-story bank with a two-story parking garage with space for 137 vehicles. The top three building levels include outdoor terraces, topped by a sixth-floor roof garden featuring greenery and trees. The rooftop is used for meetings, entertaining, and community activities, and features expansive views of Missoula and surrounding valleys.

Construction details include a steel moment frame with a masonry exterior that incorporates brick, quarried granite from South Dakota, cast stone detailing, and a high-performance glass curtain wall. The local Historic Preservation Commission approved the design being included in the historic district.

Stockman Bank’s Missoula tower achieved LEED v4 Platinum status. Sustainability measures for the low energy-use per square foot building (modeled with an EUI of 23) include 69% potable water reduction by harvesting rainwater for toilets and stormwater for irrigation, an open-loop ground source heat pump system, chilled beams, and a 48.75 kW photovoltaic array. To encourage environmentally-friendly commuting, the design also includes covered bicycle parking and electric vehicle charging stations.

Project Team
Cushing Terrell Design Team:
Principal-in-Charge, Brad Sperry
Project Manager, James Baldwin
Design Lead, Mike Tuss (retired)

Cushing Terrell Services Provided:
Architecture
Construction Administration
Electrical Engineering
Landscape Architecture
LEED Project Administration
Mechanical Engineering
Structural Engineering

Consultants:
Contractor: Hardy Construction
Civil Engineer: By Owner
Interior Design: By Owner
Geotechnical Engineer: TetraTech

Photography:
Heidi A. Long

Upcoming Events

  • Future Place

    Irving, TX

    Register Now
  • Archtober Festival: Shared Spaces

    New York City, NY

    Register Now
  • Snag early-bird pricing to Multifamily Executive Conference

    Newport Beach, CA

    Register Now
All Events