Tropicana Casino Renovations

Project Details

Project Name
Tropicana Casino Renovations
Location
Tropicana Casino & Resort2831 BoardwalkAtlantic CityNJUSA08401
Architect
SOSH Architects
Shared By
Regina
Project Status
Built
Year Completed
2015
Size
55,200 ft²
Team
Principal-in-Charge: William A. Salerno, AIA, PP
Project Manager: Vince DeGennaro
Project Architect: Michael Salerno, AIA
Director of Interior Design: Michael Mangini

Project Description

Last renovated in the 1980s, the North Tower section of Tropicana’s casino floor was outdated and underused. The SOSH team was tasked with transforming the aging space into a timeless gaming atmosphere to showcase Tropicana’s advanced gaming product while embracing the Cuban flavor of The Quarter. Adding to the design challenge was the need to seamlessly integrate an existing sports bar. The SOSH team set the stage for a fresh new gaming floor experience by delivering a sophisticated design, a new high limit zone, and a pedestrian pathway that visually guides visitors from The Quarter to the North Tower casino. Havana-inspired colors, textures and other visual cues were woven into the design, creating a lively and engaging place to play and be entertained.

Upcoming Events

  • Slate Reimagined: The Surprising Advantages of Slate Rainscreen Cladding

    Webinar

    Register Now
  • The State of Residential Design Today: Innovations and Insights from RADA-Winning Architects

    Webinar

    Register for Free
  • Specifying Smarter with Copper-Clad Aluminum (CCA) Metal-Clad Cable

    Webinar

    Register for Free
All Events