F45 Training

Project Details

Project Name
F45 Training
Location
BallstonVA
Architect
Atelier MjK
Project Types
Project Scope
Interiors
Shared By
Atelier MjK
Project Status
Built
Year Completed
2018
Size
2,230 ft²

Project Description

Atelier MjK designed a high intensity interval training facility that includes a main open exercise space, two ADA restrooms and an ADA shower. The intent was to capture F45’s aesthetics and requirements while maximizing the group training floor area.

Upcoming Events

  • Denver Dealmakers

    Denver Marriott South at Park Meadows

    Register Now
  • Accelerate Summit

    Grand Hyatt Deer Valley

    Register Now
  • Elevate

    Kimpton EPIC Hotel Miami, FL

    Register Now
All Events