Eye Hospital Building

Project Details

Project Name
Eye Hospital Building
Location
EgyptEgypt
Project Types
Healthcare
Shared By
Gaurang Trivedi
Project Status
Built

Project Description

Challenges:

• The inputs received from the client in the form of pdf files were too blur & unclear. So biggest challenge
was to first understand the inputs by proper client coordination.
• The models prepared were too heavy as level of detailing was high, so it becomes little difficult to work
with such heavy files. There were too much clashes between the models.

Execution:

• The inputs available with us were in the form of pdf files, which we were to convert into intelligent BIM
models using Revit.
• Next step was to create BIM models with different disciplines like Architectural, Structural & MEP which
was successfully accomplished as per client’s requirement in the form of 3D Revit Models.
• Finally after that we started to look into the coordination between the models, so called Clash
Detection & were successful in scrutinizing all the clashes.
• The clash detection process
helped the client to nullify the clashes at a very initial stage which may
have created huge loss at the time of actual construction.
• Material take off & project completion schedules provided by us reduced client’s overall project time,
cost as well as made the complete process error free and smoother.

Inputs Received : PDF files

Outputs Delivered :

• BIM models with following disciplines: Architecture, Structure, MEP

Software Used : Revit

For more information, visit http://www.truecadd.com/bim-modeling-services.php

Upcoming Events

  • Build-to-Rent Conference

    JW Marriott Phoenix Desert Ridge

    Register Now
  • Reimagining Sense of Place: Materiality, Spatial Form, and Connections to Nature

    Webinar

    Register for Free
  • Homes that Last: How Architects Are Designing a Resilient Future

    Webinar

    Register Now
All Events