Garrett Park Elementary School

Project Details

Project Name
Garrett Park Elementary School
Project Types
Education
Project Scope
New Construction
Shared By
GWWO
Project Status
Built
Year Completed
2011
Size
25,100 ft²
Certifications & Designations
LEED Gold

Project Description

GWWO recently worked with Montgomery County Public Schools to design a 75,250-SF addition to Garrett Park Elementary School, which replaced seventy-five percent of the existing school that previously resided on the heavily developed 4.3 acre site. Several expansions to the school occurred from the early 1950s through 1992, and in 2006 a small two-story, stand-alone addition was built. This project demolished all construction on the site except this 2006 addition. The new two-story structure design integrated with the 2006 addition to create a new complex that houses 662 students.

The new construction created a centralized main entrance for the school, responding to the bus and student drop-off loop locations. The administration suite is located between the two drop-off loops, which allows for easy supervision of the main entrance and the vehicles arriving on site. The media center is located on the second level adjacent to the upper lobby, so that it can be easily accessed from the main entrance.

Upcoming Events

  • Future Place

    Irving, TX

    Register Now
  • Archtober Festival: Shared Spaces

    New York City, NY

    Register Now
  • Snag early-bird pricing to Multifamily Executive Conference

    Newport Beach, CA

    Register Now
All Events