Rock Creek AWWTF Operations & Maintenance Building

Project Details

Project Name
Rock Creek AWWTF Operations & Maintenance Building
Location
3235 SW River RoadHillsboroUnited States97123
Project Types
Infrastructure
Shared By
Kathy Dietrich
Project Status
On the Boards/In Progress
Year Completed
2013
Size
45,000 ft²

Project Description

Major renovation and additions to an existing building at the Rock Creek Advanced Wastewater Treatment Facility. The building formerly housed maintenance and warehouse uses. The project added an operations center, staff offices and staff lunch room relocated from other locations on the multi-building campus. New exterior metal panel and masonry veneer cladding replaced the existing deteriorated EIFS system. New interior finishes throughout the building and the existing concrete floor slab is being retained with a new dyed and polished finish system.

Upcoming Events

  • Build-to-Rent Conference

    JW Marriott Phoenix Desert Ridge

    Register Now
  • Reimagining Sense of Place: Materiality, Spatial Form, and Connections to Nature

    Webinar

    Register for Free
  • Homes that Last: How Architects Are Designing a Resilient Future

    Webinar

    Register Now
All Events